Study No | Title | Report Author | Effective_Date | Status | Model Type | Submitted to FEMA | Watershed | Retention Status | Retention Start Date | Retention Period_Months | Retention Expire Date |
0 | TECHNICAL MEMORANDUM FOR CANADA DEL ORO WASH HYDROLOGY THROUGH PIMA COUNTY, ARIZONA | ARROYO ENGINEERING | 11/19/2008 | EFFECTIVE | Other | NO | CANADA DEL ORO | None | | 240 | |
0 | DRAINAGE REPORT FOR CRITTERLAND II | CMG DRAINAGE | 10/24/2000 | EFFECTIVE | Other | | | None | | 240 | |
0 | SUMMARY REPORT SAN XAVIER FLOOD HAZARD STUDY | TETRA TECH | 3/28/2014 | EFFECTIVE | Other | | SANTA CRUZ-UPPER | None | | 240 | |
0 | AREAS SUBJECT TO INUNDATION BY THE 100-YEAR FLOOD IN AVRA VALLEY, PIMA COUNTY ARIZONA | R.H. ROESKE | 1/1/1977 | EFFECTIVE | | | BRAWLEY WASH | None | | 240 | |
0 | CANADA DEL ORO FLOOD HAZARD AND EARLY WARNING ANALYSIS | PIMA COUNTY FLODD CONTROL DISTRICT | 1/12/2001 | EFFECTIVE | | | | None | | 240 | |
0 | HONEY BEE WASH & BW SERIES TECHNICAL SUPPORT APPENDIX | WLB GROUP | | EFFECTIVE | | NO | BIG WASH | None | | | |
0 | HYDROLOGIC AND HYDRAULIC DESIGN REPORT FOR THE NORTH LACHOLLA DRAINAGE IMPROVEMENT DISTRICT - PHASE I | JERRY R. JONES & ASSOCIATES INC. | 5/29/1990 | EFFECTIVE | | NO | CANADA DEL ORO | None | | | |
0 | CONCEPT DESIGN REPORT FOR FRANCO WASH TRIBUTARY PROJECT | ARROYO ENGINEERING | 2/19/1997 | EFFECTIVE | | NO | LEE MOORE | None | | | |
0 | DEMETRIE WASH GREEN VALLEY SOUTH GOLF COURSE SUPPLEMENT TO THE HYDRAULIC/FLUVIAL STUDY | MMLA | 1/25/1988 | EFFECTIVE | | NO | SANTA CRUZ-UPPER | None | | | |
0 | MASTER HYDROLOGY REPORT FOR GREEN VALLEY SOUTH | MMLA | 1/27/1989 | EFFECTIVE | | NO | SANTA CRUZ-UPPER | None | | | |
0 | RECONNAISSANCE REPORT ORANGEWOOD ESTATES FLOOD CONTROL PROJECT TUCSON ARIZONA | ARIZONA DEPARTMENT OF WATER RESOURCES | 4/1/1981 | EFFECTIVE | | NO | SANTA CRUZ-LOWER | None | | | |
0 | RANCHO VISTOSO: RIVER MECHANICS STUDY FOR BIG WASH (CONCEPT BRIDGE DESIGN AND FLOODPLAIN ENCROACHMENT STUDY) | CELLA BARR ASSOCIATES | 6/25/1984 | EFFECTIVE | | NO | BIG WASH | None | | | |
0 | FLOOD PROTECTION STUDY NORTH SIDE SPEEDWAY BOULEVARD HOUGHTON ROAD TO TANQUE VERDE LOOP ROAD FOR SILVERADO HILLS | TERRITORIAL ENGINEERS | 2/6/1989 | EFFECTIVE | | NO | TANQUE VERDE CREEK | None | | | |
0 | BIG WASH TECHNICAL SUPPORT ANALYSIS | WLB GROUP | | EFFECTIVE | | NO | BIG WASH | None | | | |
0 | TWIN BUTTES MINE POST-CLOSURE DRAINAGE AMENDMENT PART I - HYDROLOGIC AND HYDRAULIC REPORT SOUTHEASTERN PIMA COUNTY NEAR GREEN VALLEY. . . | STEFFEN ROBERTSON AND KIRSTEN (COLORADO) INC. | 8/1/1987 | EFFECTIVE | | NO | SANTA CRUZ-UPPER | None | | | |
0 | HYDROLOGIC/HYDRAULIC DESIGN ANALYSIS IN SUPPORT OF BANK PROTECTION IMPROVEMENT PLANS FOR SUN CITY VISTOSO ADJACENT TO BIG WASH VOLUME I | WLB GROUP | 11/6/1990 | EFFECTIVE | | NO | BIG WASH | None | | | |
0 | REVISED PRELIMINARY HYDROLOGIC/HYDRAULIC REPORT FOR RANCHO VISTOSO | WLB GROUP | 7/17/1986 | EFFECTIVE | | NO | BIG WASH | None | | | |
0 | REVISED EAST TRAINING DIKE UPSTREAM OF TANGERINE ROAD BRIDGE AT BIG WASH | WLB GROUP | 3/7/1989 | EFFECTIVE | | NO | BIG WASH | None | | | |
0 | MIDVALE PARK MASTER DRAINAGE REPORT | DOOLEY-JONES & ASSOCIATES | 7/29/1988 | EFFECTIVE | | NO | SANTA CRUZ-LOWER | None | | | |
0 | HEC-2 RUNS FOR BIG WASH ADJACENT TO SUN CITY VISTOSO UNITS 12 AND 17 | WLB GROUP | 3/31/1992 | EFFECTIVE | HecRas | NO | BIG WASH | None | | | |
0 | EAST TRAINING DIKE (UPSTREAM OF TANGERINE ROAD): A COMPILATION OF INSPECTION AND LAB REPORTS | WLB GROUP | 5/11/1992 | EFFECTIVE | | NO | BIG WASH | None | | | |
0 | MASTER DRAINAGE STUDY TOHONO O'ODHAM NATION - SAN XAVIER DISTRICT PHASE I - PANHANDLE AREA EXISTING CONDITIONS | MMLA | 7/31/2001 | EFFECTIVE | | NO | SANTA CRUZ-LOWER | None | | | |
0 | HYDROLOGIC AND HYDRAULIC STATEMENT FOR QUAIL CREEK ACCESS ROAD GREEN VALLEY ARIZONA | ANDERSON PASSARELLI & ASSOCIATES | 8/25/1989 | EFFECTIVE | | NO | SANTA CRUZ-UPPER | None | | | |
0 | DRAINAGE REPORT FOR PEGLER WASH FROM SHANNON ROAD TO THE CONFLUENCE WITH THE RILLITO RIVER | DOOLEY-JONES & ASSOCIATES | 6/19/1985 | EFFECTIVE | | NO | RILLITO CREEK | None | | | |
0 | CITY OF SOUTH TUCSON DRAINAGE STUDY | PIMA COUNTY REGIONAL FLOOD CONTROL DISTRICT | 7/30/1987 | EFFECTIVE | | NO | SANTA CRUZ-MIDDLE | None | | | |
0 | HYDROLOGY AND HYDRAULIC REPORT FOR RESTORATION OF COLD SPRINGS ROAD. . .CARTER CANYON ROAD. . .MARSHALL GULCH ROAD. . | RUIZ ENGINEERING CORPORATION | 2/12/1980 | EFFECTIVE | | NO | SABINO CREEK | None | | | |
0 | FINAL DRAINAGE REPORT SOUTH FOURTH AVENUE REVITALIZATION PROJECT CITY OF SOUTH TUCSON ARIZONA | COLLINS/PINA CONSULTING ENGINEERS | 8/1/1997 | EFFECTIVE | | NO | SANTA CRUZ-MIDDLE | None | | | |
0 | HIGHLANDS WASH BASIN MANAGEMENT PLAN REPORT | A-N WEST | 7/1/1986 | EFFECTIVE | | NO | CANADA DEL ORO | None | | | |
0 | TECHNICAL APPENDIX IN SUPPORT OF BANK PROTECTION IMPROVEMENT PLANS FOR SUN CITY VISTOSO ADJACENT TO BIG WASH VOLUME II | WLB GROUP | 10/19/1990 | EFFECTIVE | | NO | BIG WASH | None | | | |
0 | EAST TRAINING DIKE TANGERINE ROAD BRIDGE AT BIG WASH | PIMA COUNTY REGIONAL FLOOD CONTROL DISTRICT | 9/1/1988 | EFFECTIVE | | NO | BIG WASH | None | | | |
0 | HYDROLOGIC STUDY OF THE BULLOCK FIRE | CASTRO ENGINEERING | 8/7/2002 | EFFECTIVE | | NO | SAN PEDRO RIVER | None | | | |
0 | ROCKING K SPECIFIC PLAN APPENDIX | P & D TECHNOLOGIES | 5/15/1989 | EFFECTIVE | | NO | PANTANO WASH | None | | | |
0 | SUMMARY HYDRAULIC ANALYSIS OF TANGERINE ROAD AT BIG WASH | WLB GROUP | 11/26/1986 | EFFECTIVE | | NO | BIG WASH | None | | | |
0 | TECHNICAL SUPPORT APPENDIX FOR FINAL CONDITIONS: ROAD BRIDGE AND ULTIMATE UPSTREAM AND DOWNSTREAM ENCROACHMENT: VOLUME IV | WLB GROUP | 11/1/1986 | EFFECTIVE | | NO | | None | | | |
0 | TECHNICAL SUPPORT APPENDIX FOR INTERIM CONDITION: ROAD BRIDGE & SPUR DIKES VOLUME III | WLB GROUP | 11/1/1986 | EFFECTIVE | | NO | | None | | | |
0 | TECHNICAL DATA NOTEBOOK LETTER OF MAP REVISION AND CFR 65.10 LEVEE CERTIFICATION CANADA DEL ORO WASH--2008 SPECIAL STUDIES-REPORT | ARROYO ENGINEERING | 8/28/2009 | EFFECTIVE | | YES | CANADA DEL ORO | None | | | |
0 | TECHNICAL DATA NOTEBOOK LETTER OF MAP REVISION AND CFR 65.10 LEVEE CERTIFICATION CANADA DEL ORO WASH-2008 SPECIAL STUDIES-NATIVE SUPPORT FILES | ARROYO ENGINEERING | | EFFECTIVE | | YES | CANADA DEL ORO | None | | | |
0 | FINAL DRAINAGE DESIGN REPORT FOR CATALINA STATE PARK ROAD AND FLOOD CONTROL IMPROVEMENTS | GRENIER ENGINEERING INC. | 7/1/1986 | EFFECTIVE | | NO | CANADA DEL ORO | None | | | |
0 | SUPPLEMENT DRAINAGE REPORT FOR CAMINO REAL WASH FINAL | CASTRO ENGINEERING | 1/28/2004 | EFFECTIVE | | NO | RILLITO CREEK | None | | | |
0 | DRAINAGE REPORT FOR SOUTHEAST REGIONAL PARK -APRIL 2002 WITH 2007 UPDATE MEMO | CASTRO ENGINEERING | 4/11/2002 | EFFECTIVE | | NO | LEE MOORE | None | | | |
0 | I-10 FRONTAGE ROADS INA ROAD TO RUTHRAUFF ROAD VOLUME 2 OF 3--OFFSITE DRAINAGE APPENDICES FOR FINAL DRAINAGE REPORT | JOHNSON-BRITTAIN & ASSOCIATES | 4/1/1999 | EFFECTIVE | | NO | SANTA CRUZ-LOWER | None | | | |
0 | I-10 FRONTAGE ROADS INA ROAD TO RUTHRAUFF ROAD VOLUME 3 OF 3 -- PAVEMENT DRAINAGE - APPENDICES FOR FINAL DRAINAGE REPORT | JOHNSON-BRITTAIN & ASSOCIATES | 4/1/1999 | EFFECTIVE | | NO | SANTA CRUZ-LOWER | None | | | |
0 | I-10 FRONTAGE ROADS INA ROAD TO RUTHRAUFF ROAD VOLUME 1 OF 3--EXISTING CONDITIONS - APPENDICES FOR FINAL DRAINAGE REPORT | JOHNSON-BRITTAIN & ASSOCIATES | 4/1/1999 | EFFECTIVE | | NO | SANTA CRUZ-LOWER | None | | | |
0 | TECHNICAL SUPPORT DATA NOTEBOOK - MISSION RIDGE WASHES LETTER OF MAP REVISION (LOMR) | RS ENGINEERING | 11/13/2000 | EFFECTIVE | | NO | SANTA CRUZ-LOWER | None | | | |
0 | DRAINAGE STUDY CASTLE ROCK WASH- CRESTA VERDE SUBDIVISION TO HOUGHTON ROAD | RS ENGINEERING | 4/25/2001 | EFFECTIVE | | NO | TANQUE VERDE CREEK | None | | | |
0 | FLOOD CONTROL STUDY FOR CANADA DEL ORO WASH CATALINA AZ - SPECIAL STUDIES REPORT | PIMA COUNTY REGIONAL FLOOD CONTROL DISTRICT | 11/4/1991 | EFFECTIVE | | NO | CANADA DEL ORO | None | | | |
0 | SUPPLEMENTARY DRAINAGE ANALYSIS IN SUPPORT OF THE TENTATIVE BLOCK PLAT FOR RANCHO SAHUARITA | CELLA BARR ASSOCIATES | 7/20/1998 | EFFECTIVE | | NO | SANTA CRUZ-UPPER | None | | | |
0 | SUPPLEMENTARY DRAINAGE ANALYSIS IN SUPPORT OF THE TENTATIVE BLOCK PLAT FOR RANCHO SAHUARITA HYDROLOGIC/HYDRAULIC ADDENDUM | CELLA BARR ASSOCIATES | 2/3/1999 | EFFECTIVE | | NO | SANTA CRUZ-UPPER | None | | | |
0 | HYDRAULIC ANALYSIS FOR TORTOLITA MOUNTAIN WATERSHEDS ABOVE ALLUVIAL FAN APEXES -VOLUME 1 | CMG DRAINAGE ENGINEERING INC. | 10/27/2008 | EFFECTIVE | | NO | TORTOLITA FAN | None | | | |
0 | HYDRAULIC ANALYSIS FOR TORTOLITA MOUNTAIN WATERSHEDS ABOVE ALLUVIAL FAN APEXES -VOLUME 2 | CMG DRAINAGE ENGINEERING INC. | 6/16/2008 | EFFECTIVE | | NO | TORTOLITA FAN | None | | | |
0 | HYDRAULIC ANALYSIS FOR TORTOLITA MOUNTAIN WATERSHEDS ABOVE ALLUVIAL FAN APEXES -VOLUME 3 | CMG DRAINAGE ENGINEERING INC. | 10/14/2008 | EFFECTIVE | | NO | TORTOLITA FAN | None | | | |
0 | HYDROLOGIC & HYDRAULIC ANALYSIS FOR THE SOUTHEAST REGIONAL PARK AND FLO-2D MODEL IN A ZIP FILE | JE FULLER | 4/6/2012 | EFFECTIVE | | NO | LEE MOORE | None | | | |
0 | HYDRAULIC ANALYSIS FOR TORTOLITA MOUNTAIN WATERSHEDS ABOVE ALLUVIAL FAN APEXES -VOLUME 4 -RESPONSES | CMG DRAINAGE ENGINEERING INC. | 10/26/2008 | EFFECTIVE | | NO | TORTOLITA FAN | None | | | |
0 | HYDRAULIC ANALYSIS FOR TORTOLITA MOUNTAIN WATERSHEDS ABOVE ALLUVIAL FAN APEXES -VOLUME 5 -WORK MAPS | CMG DRAINAGE ENGINEERING INC. | | EFFECTIVE | | NO | TORTOLITA FAN | None | | | |
0 | FREQUENCY DISCHARGES WATERSHEDS OF WEST BRANCH SANTA CRUZ RIVER ARIZONA | U.S. DEPARTMENT OF THE INTERIOR | 8/1/2004 | EFFECTIVE | | NO | SANTA CRUZ-LOWER | None | | | |
0 | TUCSON'S SANTA CRUZ RIVER AND THE ARROYO LEGACY | JULIO LUIS BETANCOURT | 11/21/1988 | EFFECTIVE | | NO | SANTA CRUZ-LOWER | None | | | |
0 | MARANA DISC GOLF COURSE QUALITATIVE PONDING AND FLOODING ASSESSMENT | JE FULLER | 2/24/2015 | EFFECTIVE | | NO | SANTA CRUZ-LOWER | None | | | |
0 | 'FLOOD INSURANCE STUDY PIMA COUNTY AND INCORPORATED AREAS - SEPTEMBER 8, 2012 VOLUMES 1-3' | | 9/28/2012 | EFFECTIVE | | NO | ALL PIMA COUNTY | None | | 240 | |
0 | FLOOD INSURANCE STUDY, PIMA COUNTY AND INCORPORATED AREAS, JUNE 16, 2011, VOLUMES 1-5-2613 | | 6/16/2011 | EFFECTIVE | | NO | ALL PIMA COUNTY | None | | 240 | |
0 | TECHNICAL DATA NOTEBOOK FOR HYDROLOGIC AND HYDRAULIC MAPPING OF THE SCOTTS KNOB WASH, APPENDIX A - E | | 6/1/2015 | EFFECTIVE | HecRas | YES | CATALINA FOOTHILLS | None | | 240 | |
0 | DRAFT PRELIMINARY DRAINAGE REPORT FOR FIRST AVE FROM THE CANADA DEL ORO WASH TO TANGERINE RD | | | EFFECTIVE | | NO | CANADA DEL ORO | None | | 240 | |
0 | AGUA CALIENTE WASH STUDY | | 5/25/1995 | EFFECTIVE | Other | NO | AGUA CALIENTE WASH | None | | 240 | |
0 | UPPER CARMACK-SOUTH BRANCH SUB-BASIN MANAGEMENT STUDY PHASE 1 APPENDICES | | 6/1/1992 | EFFECTIVE | Other | NO | CATALINA FOOTHILLS | None | | 240 | |
0 | UPPER CARMACK-SOUTH BRANCH SUB-BASIN MANAGEMENT STUDY PHASE 2 APPENDICES | | 7/24/1992 | EFFECTIVE | Other | NO | CATALINA FOOTHILLS | None | | 240 | |
0 | SANTA CRUZ RIVER: APRIL, 1985, HEC-2 FOR EXISTING CONDITIONS, UPSTRAM REACHES, I-19 TO RILLITO CONFLUENCE | | 4/1/1985 | EFFECTIVE | HecRas | | SANTA CRUZ-MIDDLE | None | | 240 | |